|
2012, Vol. 49(6): 108-115 DOI: | ||
Key Techniques for the Design of the Gaoersi Extra-Long Single-Tube Tunnel on the Sichuan-Tibet Highway | ||
1 Sichuan Provincial Transportation Department Highway Planning, Survey, Design and Research Institute 2 Sichuan Province Transportation Department Highway Administration | ||
Received null Revised null | ||
Supporting info | ||
|