现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2013, Vol. 50(1): 34-39    DOI:
Discussion of the Modification Plan of the EPB TBM Applied in a Water-Rich Cobblestone Stratum in Chengdu
The 2nd Engineering Co., Ltd of China Railway No.13 Group Co., Ltd
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn