|
2013, Vol. 50(2): 66-71 DOI: | ||
Orthogonal Back-Analysis of Geotechnical Parameters for a Soft-Soil Tunnel | ||
(Jiangxi Provincial Water Conservancy Planning and Designing Institute, Nanchang 330029) |
||
Received null Revised null | ||
Supporting info | ||
|