|
2013, Vol. 50(2): 109-113 DOI: | ||
Analysis and Control of High-Speed Railway Subgrade Settlement Caused by Shallow-Shield Tunnel Construction | ||
(China Railway First Survey & Design Institute Group Co., Ltd., Xi'an 710043) |
||
Received null Revised null | ||
Supporting info | ||
|