|
2013, Vol. 50(2): 114-118 DOI: | ||
Settlement Prediction and Reinforcement Measures for a Metro Tunnel Passing Under an Existing Metro Station | ||
(China Railway 16th Bureau Group Co., Ltd., Beijing 100018) |
||
Received null Revised null | ||
Supporting info | ||
|