|
2013, Vol. 50(2): 158-163 DOI: | ||
On Construction Methods and Measures for the Humaling Tunnel in Water-Rich Tertiary Silty Fine Sand with Low Permeability | ||
(Rail Transit Company of China Railway No.19 Construction Bureau Group Co., Ltd., Beijing 101300) |
||
Received null Revised null | ||
Supporting info | ||
|