|
| 2013, Vol. 50(2): 164-172 DOI: | ||
| Analysis of Long-Term Safety Monitoring of a Tunnel Structure in a Large Fault | ||
(1 Headquarters of Yichang-Wanzhou Railway Construction of Wuhan Railway Bureau 443005;
2 China Railway Southwest Research Institute Co., Ltd., Chengdu 611731) |
||
| Received null Revised null | ||
| Supporting info | ||
|