|
2013, Vol. 50(3): 8-16 DOI: | ||
Discussion of Treatment Concepts for a Tunnel with High-Temperature Groundwater | ||
(1 Kunming Survey, Design and Research Institute Co. Ltd. of CREEC, Kunming 650200; 2 Chengdu Geological Prospecting & Geotechnical Engineering Co. Ltd. of CREEC, Chengdu 610031; 3 The No.1 Civil Construction Design and Research Institute of CREEC, Chengdu 610031) |
||
Received null Revised null | ||
Supporting info | ||
|