现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2013, Vol. 50(3): 79-86    DOI:
On the Interaction Mechanism of the Primary Support and Rock Mass
in a Loess Tunnel with a Large Section
(1  CCCC Second Highway Consultants Co. Ltd, Wuhan  430056;
2 School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing  100044)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn