|
2013, Vol. 50(3): 87-93 DOI: | ||
Experimental Study on the Reliability of Shield Tunnel Segment Joints to Remain Watertight Under High Water Pressure | ||
(1 Department of Geotechnical Engineering, Tongji University, Shanghai 20009; 2 Key Laboratory of Geotechnical and Underground Engineering, Ministry of Education, Shanghai 200092; 3 CCCC Second Highway Consultants Co. Ltd., Wuhan 430056) |
||
Received null Revised null | ||
Supporting info | ||
|