|
2013, Vol. 50(3): 168-172 DOI: | ||
Shifting Technique for a Box Culvert Structure in a Cut-and-Cover Metro Tunnel | ||
(1 Shenzhen Metro Group Co. Ltd., Shenzhen 5 18026; 2 The No.5 Engineering Co. Ltd. of China Tiesiju Civil Engineering Group Co. Ltd., Jiujiang 332900) |
||
Received null Revised null | ||
Supporting info | ||
|