|
| 2013, Vol. 50(3): 183-190 DOI: | ||
| Application of the Freezing and Horizontal Grouting Methods to the Shield Arrival for the Tianjin Metro | ||
| (Tianjin Branch of Zhongnan Construction Industrial Group, Tianjin 300000) | ||
| Received null Revised null | ||
| Supporting info | ||
|