|
2013, Vol. 50(4): 68-75 DOI: | ||
Experimental Study of Stress Release Using a Pilot Heading for a Highly Stressed Soft-Rock Tunnel | ||
(1 Mengxi-Huazhong Railway Co. Ltd., Beijing 100070; 2 Taiyuan-Zhongwei-Yinchuan Railway Co. Ltd., Xi'an 730050; 3 Engineering Management Centre, China Railway Corporation, Beijing 100844) |
||
Received null Revised null | ||
Supporting info | ||
|