|
2013, Vol. 50(4): 115-121 DOI: | ||
Backfill Grout Pressure Distribution Model for a Metro Shield Tunnel | ||
(1 Shannxi Railway Vocational Institute, Weinan 714000; 2 Xiamen Rail Transit Group Limited Corporation, Xiamen 361001) |
||
Received null Revised null | ||
Supporting info | ||
|