|
2013, Vol. 50(4): 128-137 DOI: | ||
Analysis on Deformation Induced by Advance Pre-reinforcement of Tunnel with Large Cross-section in Water-rich Sandy Rock Mass | ||
(1 Technology Center of China Railway Tunnel Group,Luoyang 471009,2 College of Planning and Architectural Engineering, Henan University of Science and Technology, Luoyang, 471003) |
||
Received null Revised null | ||
Supporting info | ||
|