现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2013, Vol. 50(4): 138-145    DOI:
On the Support Mechanism of the Pre-Reinforcement System
for the L7 Deep, Weak Water-Rich Zone Passed Through
by the Liangshan Tunnel
(Southeast Coast Railway Fujian Co. Ltd., Fuzhou 350000)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn