|
2013, Vol. 50(4): 138-145 DOI: | ||
On the Support Mechanism of the Pre-Reinforcement System for the L7 Deep, Weak Water-Rich Zone Passed Through by the Liangshan Tunnel | ||
(Southeast Coast Railway Fujian Co. Ltd., Fuzhou 350000) | ||
Received null Revised null | ||
Supporting info | ||
|