|
2013, Vol. 50(4): 176-182 DOI: | ||
Discussion of Grouting Reinforcement Technology for the Collapsed Section of the Huangjin Tunnel on the Newly-Built Ganzhou-Shaoguan Railway | ||
(1 China Railway Ruiwei Foundation Engineering Co. Ltd., Beijing 100055; 2 Technology Centre of China Railway Tunnel Group Co. Ltd., Luoyang 471009) |
||
Received null Revised null | ||
Supporting info | ||
|