现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2013, Vol. 50(6): 52-57    DOI:
Aseismic Calculations for a Shield Tunnel Cross Section Based on the Response Displacement Method
(Guangdong Communication Polytechnic, Guangdong   510650)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn