|
2013, Vol. 50(6): 147-151 DOI: | ||
Design and Analysis of a Double-Arch Tunnel with Concealed, Sprayed Irregular-Composite Mid-Wall | ||
(1 China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031;
2 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031) |
||
Received null Revised null | ||
Supporting info | ||
|