现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(1): 32-37    DOI:
Research on Ground Motion Parameter Correction in the Response Acceleration Method
(1 School of Civil Engineering and Architecture, Henan University, Kaifeng 475004; 2 Department of Bridge Engineering, Tongji University, Shanghai 200092)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn