|
2014, Vol. 51(1): 138-143 DOI: | ||
Comparison and Analysis of Temporary Support Schemes for the Middle Pilot Heading in a Multi-Arch Loess Tunnel | ||
(1 Beijing Urban Construction Design and Development Group Co. Ltd., Chongqing 401120; 2 Civil Engineering and Architecture School of Chongqing Jiaotong University, Chongqing 400074) | ||
Received null Revised null | ||
Supporting info | ||
|