现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(1): 138-143    DOI:
Comparison and Analysis of Temporary Support Schemes for the Middle Pilot Heading in a Multi-Arch Loess Tunnel
(1 Beijing Urban Construction Design and Development Group Co. Ltd., Chongqing 401120; 2 Civil Engineering and Architecture School of Chongqing Jiaotong University, Chongqing 400074)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn