|
2014, Vol. 51(1): 192-198 DOI: | ||
A Study of Controlled Blasting Techniques for the Multi-Arch Songjiawan Tunne | ||
(1 School of Civil Engineering, Wuhan University, Wuhan 430072; 2 College of Science, Wuhan University of Science and Technology, Wuhan 430065; 3 Construction Headquarters of Shiyan-Baihe Expressway, Shiyan 442000) | ||
Received null Revised null | ||
Supporting info | ||
|