|
2014, Vol. 51(2): 115-121 DOI: | ||
Tunnel Construction Procedures in a Tertiary Water-Rich Fine Sandstone Stratum with Weak Muddy Cementation | ||
(China Railway First Survey and Design Institute Group Ltd., Xian 710043) | ||
Received null Revised null | ||
Supporting info | ||
|