现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(2): 122-126    DOI:
Construction Techniques for Mutually Connected Clustered Excavations with Complex Ventilation Channels and Rooms
(No.2 Construction Company of China Railway, No.2 Engineering Group Co. Ltd., Chengdu 610092)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn