|
2014, Vol. 51(3): 67-72 DOI: | ||
Analysis of Karst Development Zones Based on Surface Settlement | ||
(1 Institute of Geotechnical and Geological Engineering, Fuzhou University, Fuzhou, 350108; 2 China Railway Tunnel Group Co. Ltd, Luoyang, 471009) | ||
Received null Revised null | ||
Supporting info | ||
|