现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(3): 181-187    DOI:
Key Techniques of the Arch-Cover Method for Bored Metro Stations
(China Construction Communications Engineering Group Co., Ltd., Beijing 100161)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn