现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(4): 121-126    DOI:
Tracking and Determination of Cutter Damage Based on the Driving Parameters of a Shield
(1 Guangzhou Municipal Dunjian Underground Construction Engineering Co. Ltd., Guangzhou 510030; 2 Guangdong Pearl River Delta Intercity Railway Co. Ltd., Guangzhou 510308; 3 China Tunnel Construction Co. Ltd., Guangdong, Guangzhou 5100750)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn