|
2014, Vol. 51(4): 178-184 DOI: | ||
Risks and Countermeasures for the Shenzhen-Guangzhou-Zhongshan (SGZ) Shield-Tunnel Project Crossing the Pearl River Estuary | ||
(1 College of Science and Engineering, Jinan University, Guangzhou 510632; 2 Guangzhou Metro Corporation, Guangzhou 510335; 3 Guangzhou Mass Transit Engineering Consultant Co. Ltd., Guangzhou 510010) | ||
Received null Revised null | ||
Supporting info | ||
|