|
| 2014, Vol. 51(5): 92-98 DOI: | ||
| Model Test Study of the Active Freezing Scheme for the Combined Pipe-Roof and Freezing Method | ||
| (1 Department of Geotechnical Engineering, Tongji University, Shanghai 200092; 2 Key Laboratory of Geotechnical and Underground Engineering, Ministry of Education, Tongji University, Shanghai 200092; 3 CCCC Second Highway Consultants Co. Ltd., WuHan 430056) | ||
| Received null Revised null | ||
| Supporting info | ||
|