现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(5): 186-194    DOI:
Optimization and Improvement of Shield Construction Measures in a Silty Soil Stratum
(1 CCCC Fourth Harbor Engineering Institute Co. Ltd., Guangzhou 510288; 2 Zhejiang College of Construction, Hangzhou 311231; 3 Zhejiang University, Hangzhou 310058; 4 Shanghai Mechanized Construction Co. Ltd., Shanghai 200072)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn