|
2014, Vol. 51(6): 94-100 DOI: | ||
Settlement Prediction for a Metro Tunnel Adjacent to a Deep Large-Scale Foundation Pit | ||
(1 Zhejiang Design Institute of Water Conservancy and Hydroelectric Power, Hangzhou 310002; 2 Zhejiang Electric Power Design Institute, Hangzhou 310012;3 School of Earth Sciences and Engineering, HoHai University, Nanjing 210098) | ||
Received null Revised null | ||
Supporting info | ||
|