|
| 2014, Vol. 51(6): 101-107 DOI: | ||
| On Scheme Optimization of the PBA Subway Station Underneath a Bridge | ||
| (1 Beijing ZZZD Traffic Engineering Technology Co. Ltd., Beijing 100029; 2 Department of Hydraulic Engineering, Tsinghua University, Beijing 100084; 3 College of Transportation, Jilin University, Changchun 130022) | ||
| Received null Revised null | ||
| Supporting info | ||
|