|
2014, Vol. 51(6): 130-135 DOI: | ||
Model Test Study of the Anchor Bolt Arrangement in a Loess Subway Tunnel | ||
(1 Beijing Urban Construction Design and Development Group Co. Ltd., Beijing 100045; 2 Transport Planning and Research Institute, Ministry of Transport, Beijing 100028; 3 Qingdao Guoxin Jiaozhou Bay Transportation Co. Ltd., Qingdao 266500) | ||
Received null Revised null | ||
Supporting info | ||
|