|
2014, Vol. 51(6): 148-153 DOI: | ||
Key Techniques for EPB Shield Construction in a Waterless Sandy Stratum with Cobbles and Boulders | ||
(1 Beijing Jiaotong University, Beijing 100044; 2 Beijing No.4 Municipal Construction Engineering Co. Ltd., Beijing 100176) | ||
Received null Revised null | ||
Supporting info | ||
|