现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2014, Vol. 51(6): 148-153    DOI:
Key Techniques for EPB Shield Construction in a Waterless Sandy Stratum with Cobbles and Boulders
(1 Beijing Jiaotong University, Beijing 100044; 2 Beijing No.4 Municipal Construction Engineering Co. Ltd., Beijing 100176)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn