|
2014, Vol. 51(6): 179-185 DOI: | ||
Improvement of the Shield Foam System and Relevant Field Tests | ||
(1 CCCC Fourth Harbor Engineering Institute Co. Ltd., Guangzhou 510288; 2 Shanghai Mechanized Construction Co. Ltd., Shanghai 200072) | ||
Received null Revised null | ||
Supporting info | ||
|