|
2015, Vol. 52(1): 9-18 DOI: | ||
Technical Status and Case Study on Intervention in the Shield Chamber | ||
(1 Key Laboratory of Geomechanics and Embankment Engineering, Hohai University, Ministry of Education, Nanjing 210098; 2 College of Civil and Transportation Engineering, Hohai University, Nanjing 210098; 3 CCCC Tunnel Engineering Co. Ltd., Beijing 100088) | ||
Received null Revised null | ||
Supporting info | ||
|