|
2015, Vol. 52(1): 119-126 DOI: | ||
Influence of Key Parameters of a TBM Gauge Disc Cutter on Rock-Breaking Efficiency | ||
(1 School of Mining Engineering, Luliang University, Luliang 033000; 2 College of Mechanical and Electrical Engineering, Central South University, Changsha 410083; 3 Hunan Huayin Energy Technology Co. Ltd., Changsha 410001) | ||
Received null Revised null | ||
Supporting info | ||
|