|
2015, Vol. 52(1): 143-149 DOI: | ||
Prediction of Ground Settlement Induced by Metro Shield Construction Based on the Modified Peck Formula | ||
(1 Guangzhou Metro Corporation, Guangzhou 510335; 2 Beijing Agiletech Engineering Consulting Co. Ltd., Beijing 100037) | ||
Received null Revised null | ||
Supporting info | ||
|