|
2015, Vol. 52(1): 168-176 DOI: | ||
Anaysis of Construction Techniques for a Metro Tunnel Approaching an Existing Station | ||
(1 Beijing Jiaotong University, Beijing 100044; 2 Xi'an University of Architecture and Technology, Xi'an 710055; 3 China Railway Construction Bridge Engineering Bureau Group Co. Ltd., TianJing 300300) | ||
Received null Revised null | ||
Supporting info | ||
|