|
2015, Vol. 52(2): 120-127 DOI: | ||
Back Analysis of the Incremental Displacement of a Long-Span Bored Metro Station | ||
1 Key Laboratory and Engineering and Technological Research Center of Ministry of Education, Southwest Jiaotong University 2 School of Civil Engineering, Shouthwest Jiaotong University 3 China Railway Shanghai Design Institute Group Co., Ltd | ||
Received null Revised null | ||
Supporting info | ||
|