|
| 2015, Vol. 52(2): 128-134 DOI: | ||
| Field Tests Regaring the Uncertainty of the Calculation Model for Soil Filling Pressure on Open-Cut Tunnels | ||
| 1 School of Civil Engineering and Architecture, Beijing Jiaotong University 2 China Railway Siyuan Survey and Design Group Co., Ltd | ||
| Received null Revised null | ||
| Supporting info | ||
|