|
2015, Vol. 52(2): 135-142 DOI: | ||
Full-Scale Test of the Early Performance of a Factory-Prefabricated Immersed Tunnel | ||
1 School of Materials Science and Engineering, Tongji University 2 Department of Geotechnical Engineering, Tongji University 3 CCCC Fourth Harbor Engineering Institute Co., Ltd 4 Hong Kong -Zhuhai-Macao Bridge Authority | ||
Received null Revised null | ||
Supporting info | ||
|