现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2015, Vol. 52(3): 63-68    DOI:
A Study of the Interaction Between the Pipes of a Curved Pipe-Roof
(1 Guangdong Nanyue Transportation Investment & Construction Co. Ltd., Guangzhou 510101; 2 Zhuhai Link Management Center of HongKong-Zhuhai-Macao Bridge Project, Zhuhai 519030)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn