|
2015, Vol. 52(3): 175-181 DOI: | ||
Calculation Method for Surrounding Rock Pressure of a Loess Highway Tunnel with an Extra-Large Section | ||
(No.5 Engineering Corporation of China Railway 19th Bureau Group, Dalian 116000) | ||
Received null Revised null | ||
Supporting info | ||
|