|
2015, Vol. 52(4): 7-14 DOI: | ||
Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure | ||
1 CCCC Second Highway Consultants Co. Ltd 2 CCCC Nanjing Weishan Road River-Crossing Tunnel Construction Headquarters | ||
Received null Revised null | ||
Supporting info | ||
|