|
2015, Vol. 52(4): 15-23 DOI: | ||
Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project | ||
1 CCCC Tunnel Engineering Co., Ltd 2 Technical Center of CCCC Second Harbor Engineering Co., Ltd | ||
Received null Revised null | ||
Supporting info | ||
|