|
2015, Vol. 52(4): 55-61 DOI: | ||
Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling | ||
1 CCCC Tunnel Engineering Co., Ltd 2 CCCC Nanjing Weisan Road River-Crossing Tunnel Construction Headquarters | ||
Received null Revised null | ||
Supporting info | ||
|