|
2015, Vol. 52(4): 101-104 DOI: | ||
Study and Application of Synchronous Grouting Techniques in the Launching Section of an Extra-Large Diameter Shield Tunnel | ||
(CCCC Tunnel Engineering Company Ltd., Beijing 100088) | ||
Received null Revised null | ||
Supporting info | ||
|