|
2015, Vol. 52(4): 173-178 DOI: | ||
GPR Forward Simulation for Shield Tunnel Conditions Based on the Consistent Information Removal Method | ||
(1 CCCC Second Highway Consultants Co. Ltd., Wuhan 430056; 2 CCCC Investment Company Limited, Beijing 100029; 3 Department of Geotechnical Engineering, Tongji University, Shanghai 200092; 4 CCCC Nanjing Weisan Road River-Crossing Tunnel Construction Headquarters, Nanjing 211800) | ||
Received null Revised null | ||
Supporting info | ||
|