现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2015, Vol. 52(4): 173-178    DOI:
GPR Forward Simulation for Shield Tunnel Conditions Based on the Consistent Information Removal Method
(1 CCCC Second Highway Consultants Co. Ltd., Wuhan 430056; 2 CCCC Investment Company Limited, Beijing 100029; 3 Department of Geotechnical Engineering, Tongji University, Shanghai 200092; 4 CCCC Nanjing Weisan Road River-Crossing Tunnel Construction Headquarters, Nanjing 211800)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn