|
2015, Vol. 52(4): 190-194 DOI: | ||
Application of Grouting and Water-Blocking Techniques to the Replacement of Shield Tail Seal Brushes in a Permeable Strata with High Water Pressure | ||
(1 CCCC Second Harbour Engineering Co. Ltd., Wuhan 430040; 2 Engineering Equipment Branch of CCCC Second Harbour Engineering Co. Ltd., Wuhan 430014; 3 National Enterprise Technology Center, CCCC Second Harbour Engineering Co. Ltd., Wuhan 430040) | ||
Received null Revised null | ||
Supporting info | ||
|